Showing posts with label Industrial Skipper. Show all posts
Showing posts with label Industrial Skipper. Show all posts
Thursday, June 20, 2019
Wednesday, June 19, 2019
Industrial Skipper Unloading Wind Turbine Blades 06/18-19/2019
The Industrial Skipper unloaded large wind turbine blades over a 3 day period, at Lake Superior Warehousing.
The blades will be transported by road in the coming months.
Monday, June 17, 2019
Industrial Skipper arrived Duluth 06/17/2019
Industrial Skipper arrived Duluth early this morning with a load of wind turbine blades destined for another wind farm somewhere in the Midwest.
Subscribe to:
Posts (Atom)