Late last evening at 20:45, as the Duluth Aerial Lift Bridge was lifting for the 1000 foot American Integrity, the bridge lost power and the alert crew of the Integrity made a go-around and re-entered once the power was restored.
Had the crew and Bridge Operator not done a superb job in dealing with this emergency, a catastrophe would have occurred in front of a crowded Canal park.
This video will show the first attempted entry and the go-around.
Philip R. Clarke arrived at 05:27
Algowood (CA) arrived at 06:36
Philip R. Clarke departed at 10:23
John G. Munson arrived at 13:50
Alamosborg (Dutch) departed at 17:14
Algowood departed at 22:00