Tuesday, March 24, 2015
Mesabi Miner departed Duluth 03/24/2015
The second boat departure from Duluth this season, the Mesabi Miner departed for Two Harbors this morning at 2AM
Monday, March 23, 2015
John G Munson opens the 2015 Shipping Season
The John G Munson slipped through light ice and off into Lake Superior late this afternoon to open the 2015 Shipping Season in Duluth.
News from Seaway Port Authority - Duluth
CHANGE IN DEPARTURE SCHEDULE – latest update:
First vessel of the 2015 shipping season to depart the Port of Duluth-Superior – the John G. Munson – is now set to leave the CN Duluth Dock between 3:30 and 4 p.m. (CDT) today, make its way through the harbor and head out beneath the Duluth Aerial Bridge. The Mesabi Miner is expected to depart sometime after 7 p.m.
Sunday, March 22, 2015
Camera Update!
FYI, The Pier B and Bayfront camera streams will be down until Monday AM. The snapshot feeds are still working.
Saturday, March 21, 2015
Boats will start moving on Monday
Press Release from Duluth Seaway Port Authority:
Sure Sign of Spring … 2015 Shipping Season to get underway Monday in Port of Duluth-Superior
Duluth, Minn., USA (March 20, 2015)—The first two U.S.-flag lakers are on schedule to depart the Port of Duluth-Superior on Monday, March 23, signaling the start of the 2015 commercial shipping season at this end of the Great Lakes St. Lawrence Seaway system.
On Sunday morning, the John G. Munson, with an assist from Heritage Marine tugs, is set to move from its winter berth at Fraser Shipyards in Superior to first fuel at the Port Terminal then shift over to the CN Duluth Dock to load 24,000 short tons of iron ore pellets. On Monday morning, the Munson is slated to depart beneath the Aerial Bridge, destined for Gary, Indiana.
Late Monday afternoon/early evening, the Mesabi Miner is expected to depart from the Superior Midwest Energy Terminal with some 57,000 tons of coal onboard for the power plant at Taconite Harbor. After making that delivery, the 1,000-footer will return to the Twin Ports for a couple of days of scheduled maintenance work and to load its next coal cargo.
[NOTE: All vessel arrival/departure times are estimates and may change without notice.]
While Lake Superior looks bright blue in the early spring sunshine here in Duluth-Superior, there is still a significant amount of ice cover on the eastern edge of the Lake – two to three feet thick from Whitefish Point to the St. Marys River. As such, U.S. Coast Guard cutter Alder will be working in tandem with USCGC Mackinaw to lay tracks and provide escorts for vessels as needed through that eastern ice pack to and from the Soo Locks.
At this point in time, the Munson is expected to be the first downbound commercial vessel in position to transit the Soo Locks this season. It also appears there may be four upboundvessels waiting below the Soo Locks when they reopen at 12:01 a.m. on Wed., March 25 – including the Edwin H. Gott, Edgar B. Speer, Roger Blough and the Algoma Olympic.
The Soo Locks provide the gateway for lake carriers – some measuring more than 1,000 feet in length – to move raw materials like iron ore, coal, limestone, cement and salt between Lake Superior and Lakes Michigan, Huron and Erie. It is also one of 16 sets of locks along the Great Lakes St. Lawrence Seaway (GLSLS) that allows oceangoing ships (“salties”) to move breakbulk and project cargoes in and out of North America’s heartland and deliver Midwestern grains to Europe, the Middle East and North Africa.
“Against what seemed like insurmountable odds with everything Mother Nature threw at us from beginning to end, the Port of Duluth-Superior wrapped up the 2014 shipping season a full 2.3 percent ahead of expectations, having moved over 37.5 million short tons of cargo,” said Vanta Coda, Duluth Seaway Port Authority executive director. “There are still some formidable ice challenges along the Great Lakes-Seaway, but nowhere near what the fleets were facing at this same time last year.”
“We anticipate a banner year here at the Port Terminal for project cargo moving through Duluth in 2015,” noted Coda. “This Port sits at the nexus of multiple energy sectors, so we’ll be seeing several shipments of equipment heading in from Europe and elsewhere destined for wind energy installations and oil/gas fields further north and west. All told, the Port of Duluth-Superior should see a two percent increase in activity during 2015. Headwinds do exist in the decline of commodity pricing (e.g. iron ore and oil). And the strengthening U.S. dollar will challenge exports, however import prospects will improve.”
It’s a bit harder to predict the arrival of the Port’s first oceangoing vessel. The Seaway locks (the Montreal/Lake Ontario section and Welland Canal) won’t reopen for business this year until April 2, so it will be at least another week later before the Port of Duluth-Superior will see its first saltie. That first saltie to pass beneath the Aerial Lift Bridge will be greeted by maritime officials with a welcoming ceremony and will also qualify a winner for the annual “First Ship Contest” sponsored by the Duluth Seaway Port Authority and Visit Duluth. Last year, due to dramatic ice conditions, the Port’s first saltie, the Diana, didn’t arrive until May 7 (the latest on record).
Of the five vessels that wintered over in the Twin Ports for repair and maintenance, the remaining three – Kaye E. Barker, American Integrity and the Indiana Harbor – aren’t scheduled to depart until late March or early April.
Close to 1,000 ships visit the Port of Duluth-Superior each year, moving roughly 38 million tons of cargo – iron ore, coal, grain, limestone, cement, salt, plus project cargo and more. As the largest tonnage port on the Great Lakes-Seaway, cargo movements through the Port of Duluth-Superior support 11,500 jobs and contribute over $1.5 billion in business revenues to the local/regional economy. For more info: www.duluthport.com
Subscribe to:
Posts (Atom)