Sunday, December 3, 2017

Indiana Harbor Emergency 360 Turn 12/01/2017



During a nighttime arrival, the Duluth Aerial Lift Bridge experienced a malfunction that ended up diverting the 1000 ft Indiana Harbor into a 360 turn (Timelapse).  Good communications between the Bridge Operator and Indiana Harbor Captain avoided a possible serious problem. (Audio is in the first minute of recording)

Philip R Clarke arrived Duluth 12/03/2017



Philip R Clarke arrived Duluth this morning loaded with Limestone.

Saturday, December 2, 2017

Harbor Moon



The moonrise tonight as it rose behind the Lift Bridge on a quiet December evening.

This timelapse is composed of 650 images taken during a 90 minute period.