Thursday, December 5, 2019

Edwin H Gott arrived Duluth 12/5/2019



Edwin H Gott arrived Duluth this morning

Paul R Tregurtha departed Duluth 12/05/2019



Paul R Tregurtha departed Duluth this morning loaded with coal.

Lift Bridge in Service

Update: 12/5/2019 09:00  Duluth Lift Bridge in service.

Update: 12/5/2019 - 07:00  Deicing will continue on the Lift Bridge today.

Update: 12/04/2019 - 16:00  The lift bridge remains out of service until further notice.

Due to heavy ice accumulation on the Lift Bridge, it will remain closed to boat traffic as deicing efforts continue.

The 900 ton bridge span is balanced by two 450 ton concrete weights on either side. Usually the span can easily be lifted by electric motors, however, they cannot lift the additional weight of the ice.

Overnight Wisconsin Point Boat Traffic 12/5/2019



With the Duluth Lift Bridge inoperable due to ice buildup, boat traffic has increased through the Wisconsin Entry.

Monday, December 2, 2019

Bayfront Cam Ice removed

The ice covering on the Bayfront Cam is now removed. There was about 1/2 inch left to chip away.